Environmental Licensing Studies
- Environmental Impact Statement (DIA);
- Strategic Environmental Assessment (SEA);
- Preparation of Terms of Reference (TR);
- Environmental Impact Study and Environmental Impact Report (EIR / RIMA);
- Seismic Environmental Study and Seismic;
- Environmental Impact Report (EIR/ RIAS);
- Environmental Control Report (ECR);
- Neighborhood Impact Study (NIS);
- Risk Analysis Study (RAS);
- Environmental Control Plan (ECP);
- Plan for Conservation and Use of Artificial Reservoir Intake (PACUERA);
- Studies for Preliminary License (LP), Installation License (IL), Operating License (OL), Corrective Operation License (COL) and Environmental Regularization License (LAR).
Services done
DIA Preparation for deployment of allotment in Vila Velha and Guarapari.
Client: Cipasa Preparation
DIA for deployment of Allotment in Aracruz / ES.
Client: Cipasa
Strategic Environmental Assessment for Shipyard Implementation.
Client: Jurong
Shipyard Strategic Environmental Assessment in pre-selected area for the installation of Barge Terminal in the Regency district.
Client: União Engenharia
Seismic Environmental Study (EAS), respective Seismic Environmental Impact Report (RIAS) and the Seismic Environmental Control Plan (PCAS).
Client: Petrobras
EIA / RIMA aiming at environmental licensing for the implementation of Offshore Logistic Support Base, located in Itapemirim / ES.
Client: Chouest Offshore
EIA / RIMA aiming at licensing the Sanitary Landfill for Waste - Class I and II, located in the city of Linhares / ES.
Client: Vital Engenharia
EIA / RIMA aiming at environmental licensing for the implementation of Itaoca Terminal Marítimo, located in the municipality of Itapemirim / ES.
Client: Terminal marítimo de Itaoca
Environmental Impact Study / Environmental Impact Report (EIA / RIMA) aiming at the environmental licensing of the Vitória-Vila Velha Crossing Project / ES.
Client: Sondotécnica
EIA / RIMA aiming at environmental licensing of UTE Joinvile / ES and João Neiva / ES.
Client: Bertin
EIA / RIMA aiming at environmental licensing for extraction, storage and expedition of Brine in the municipality of Conceição da Barra / ES.
Client: Petrobras
UN-ES / SEAL EIA / RIMA aiming at environmental licensing for implementation of Guarapari / ES Thermoelectric Plant.
Client: Engenharia Ativa
EIA / RIMA targeting the 500 kV Transmission Line connecting Linhares Thermoelectric Cluster SE to Viana 2 SE.
Client: Energética Capixaba
EIA / RIMA aiming at environmental licensing of bridges between Vitória and Cariacica, access and viaduct in Vitória / ES.
Client: EGT Engenharia
EIA / RIMA aiming at environmental licensing for the implantation of Shipyard in Barra do Sahy, Aracruz / ES.
Client: Jurong Shipyard
EIA / RIMA Bioenergetic Alcohol Plant Good Hope and Thermoelectric Plant.
Client: Bioenergetica boa esperança.
Preparation of EIA / RIMA - BS Pre-Salt Pole Step 04.
Client: Petrobras
Elaboration of Neighborhood Impact Study in the municipality of Aracruz.
Client: Cipasa
Elaboration and / or suggestion of the Neighborhood Impact Study TR.
Client: Centro de convenções de Vitória
Elaboration Risk Analysis Study (EAR).
Client: Liquiport
Cercado da Pedra Business Center, in the municipality of Serra / ES.
Client: Suppin
Environmental Studies 3D Itaúnas Seismic.
Client: Petrobras
Preparation of Consultation Letter and Term of Reference for the licensing of Capixaba Oil Refinery project.
Client: Brazilian Oil Refinery
Interconnection of Carlos Lindenberg Avenue to the 3rd Bridge, municipality of Vila Velha / ES.
Client: Rodosol and Dertes
Environmental Studies 2-ANP-6-MT Drilling in the Parecis Basin, Mato Grosso State.
Client: Petrobras
Environmental monitoring of 3DHD FAL seismic survey activities.
Client: Petrobras
Environmental studies, environmental management of the implementation and operation, demobilization and management of environmental liabilities.
Client: VLI Port Operations
Environmental Studies - 3D seismic Barra do Ipiranga.
Client: Petrobras
Preparation of Consultation Letter and Term of Reference for licensing of Volare Veículos, in the municipality of São Mateus / ES.
Client: Marcopolo
Elaboration of Terms of Reference for the implementation of marine artificial reef project.
Client: Imetame
Environmental Studies - 3D Burned Farm Seismic.
Client: Petrobras
Environmental monitoring and management services of the Lagoa Bonita Seismic Program.
Client: Petrobras
Environmental studies, environmental management of the implementation and operation, demobilization and management of environmental liabilities.
Client: VLI Port Operations
Installation and Operation of the Drilling Fluid and Bulk Plant at the oil and gas support base, Supply Base, in the backyard of the Peiú Port Terminal.
Client: M-I Drilling Fluids from Brazil
Installation and operation of the Macrobrachium Rosenbergii Freshwater Shrimp Breeding Project at Fazenda da Pedra, Cabo Frio / RJ.
Client: Camaroneira São João
Installation of the support base for oil and gas activities, Supply Base, in the Peiú area.
Client: Peiú Port Terminal
Environmental licensing of the drilling activity of an onshore hydrocarbon exploratory well at Concession BT-PN-3, in the Parnaíba Basin.
Client: Petrobras
Fuel Alcohol (Ethanol) Storage and Shipping Terminal at São Torquato Port Terminal.
Client: Oiltanking Terminals
Environmental licensing of SHP Cachoeira do Inferno.
Client: Luz e Força Santa Maria
Elaboration Basic Environmental Plan (PBA) Linhares Thermoelectric Cluster.
Client: Bertin
RAS for licensing gravel lending area in block BT-PN-2, in the Parnaíba Basin.
Client: BP Energy
Preparation of Reference Term for Metallurgical Plant.
Client: Paranapanema
Steam Collection and Injection System in Fazenda Alegre Field, Jaguaré / ES.
Client: Petrobras UN-ES / ATP / NC
Grant request for regularization of fish nets tanks.
Client: Networks Program - Votorantin Institute
Environmental licensing in the São Francisco basin, Block BT-SF-2.
Client: Petrobras
Preparation of environmental studies to meet the conditions of the LP.
Client: Energy Differential
Licensing for Mooring Docks at the Module Manufacturing Base at Barra do Riacho Port.
Client: Carioca Engenharia
Environmental licensing of two BT-PN-3 onshore wells in the Parnaíba Basin in the state of Maranhão.
Client: Petrobras
Preparation of Consultation Letter and Term of Reference aiming at licensing of Fabril - Vehicle Assembly Line.
Client: Distract
Preparation of an Environmental Assessment Report and Impact Monitoring Plan of ETE Mulembá.
Client: Foz do Brasil
Environmental Studies - 3D seismic Santa Luzia Farm.
Client: Petrobras
Development of the Itaoca Terminal Marítimo Luminotécnico Project, with a view to subsidizing it in the implementation and operation phases, in compliance with the condition.
Client: Itaoca Maritime Terminal
Environmental Feasibility Analysis for installation of a real estate development in the municipality of Vila Velha / ES.
Client: FGR Urbanismo
Hydrocarbon Production in Wells located at Campo Marginal Rio Ipiranga, municipality of Linhares / ES, under the concession of Cheim Transportes.
Client: Cheim Transportes
Studies complementary to the RCA of the Tissue Paper Production Unit.
Client: Factory Letter
Preparation of Consultation Letter and TR for licensing the Capixaba Oil Refinery project.
Client: Transpetro
Environmental Licensing - New Conventional Coqueria Battery.
Client: ArcelorMittal
Program for Monitoring and Monitoring Environmental Impacts aiming at Preliminary License LP granted to Itaoca Terminal Marítimo, located in the municipality of Itapemirim / ES.
Client: Itaoca Maritime Terminal
Environmental Studies 3D Seismic Ibiribas.
Client: Petrobras
Seismic Environmental Studies 3DHD FAL.
Client: Petrobras
Regularization of Environmental Licenses.
Client: EDP
Elaboration of Terms of Reference for implementation of Marine Artificial Reefs, in compliance with the condition of the Offshore Logistics Support Base, located in Itapemirim / ES.
Client: C-Port
Plan for Conservation and Use of the Surroundings of Artificial Reservoirs (PACUERA) PCH Mascarenhas.
Client: Energest
PACUERA of Cachoeira Caldeirão HPP.
Client: Caldeirão Waterfall
Plan for Conservation and Use of the Surroundings of Artificial Reservoirs (PACUERA) of Santo Antônio do Jari HPP.
Client: ECE Participações
Conservation and Use Plan for the Artificial Reservoir Surroundings (PACUERA) PCH Jucu.
Client: Energest
PCA elaboration for licensing the Bota-Fora area, in the municipality of Aracruz / ES.
Client: Delamari Loureiro Elaboration of the Environmental Control Plan
PCA for licensing the subdivision in Cachoeiro de Itapemirim.
Client: Cipasa
PCA of Vitoriapar.
Client: Vitoriapar
PCA for the granting of an environmental landfill and earthmoving permit on the BR-101- Contorno de Vitória / ES.
Client: Jacuhy Urbanismo Ltda
PCA of the Sports and Leisure Center of Cariacica (CELC).
Client: SESC Locatran Terraplanagem e Leasing PCA.
Locatran PCA of nets for fish farming.
Client: Redes Program
Liquiport PCA for fruit processing plant.
Client: Redes Program - Instituto Votorantin
PCA for drilling the LOC- exploratory well, in Exploratory Block ES-T419.
Client: Petrosynergy
Elaboration of the PCA and Adequacy of the Waste Management Plan. Health Services (PGRSS).
Client: Linhares City Hall
PCA elaboration for allotment licensing in Aracruz.
Client: Cipasa PCA of Praia Electricity Substation, municipality of Vitória / ES.
Client: EDP Renováveis Brasil
PCA for the implementation of the natural gas capture project.
Client: Ecometano
Elaboration of PCA for Earthworks in the Implementation Area of the Construction Site.
Client: Carioca Engenharia
PCA of the TDB Estruturas Metálicas plant in São Mateus / ES.
Client: TDB Metal Structures
PCA for Licensing of Drilling Activity for Stratigraphic Well 2-ANP-5-MA, São Luís Basin / MA.
Client: Petrobras
Elaboration of PCA for licensing the activity of Petroleum Coke Sieving.
Client: Unimetal
Elaboration of PCA.
Client: Hipermix
RCA for licensing of Volare Veículos
Client: Marcopolo
TPP Linhares II
Client: Energy DifferentialRCA on the 138 kV Santa Teresa Distribution Line - Rio Bonito, Santa Teresa / ES
Client: Escelsa - Energias do Brasil
RCA at 138 kV Linhares Cacimbas, located in the municipality of Linhares / ES
Client: Escelsa - Energias do Brasil
Locatran RCA Earthmoving and Leasing
Client: Locatran
RCA for the Exploration and Exploration Wells Activity of Girassol (1-GRS-1-ES) and Margarida (1-MGR-1-ES), in Blocks ES-T-401 and ES-T-410, in the municipality from São Mateus / ES
Client: Starfish
RCA on the 138 kV Carapina Alto Lage Distribution Line, municipalities of Cariacica / ES and Serra / ES
Client: Escelsa - Energias do Brasil
RCA elaboration for Choice II and Cacimbaes II TPPs
Client: Spectrum
Elaboration of the RCA of CTR - Environmental Brand expansion areas
Client: Environmental Brand
Environmental Control Report of the 3D Inhambú Seismic Program, located in São Mateus / ES
Client: Petrobras UN-ES / ATEX / SMS
RCA for drilling activity in block BT-PN-2 in the Parnaíba Basin
Client: BP EnergyRCA for the installation of well ES 318 to be drilled in the municipality of Conceição da Barra / ES
Client: Brazalto - Brasil Norte Trading of Petróleo Ltda
RCA Installation and Operation of the Maiate x SM-08 Gas Collection Line, in the municipality of São Mateus / ES, and the Guajuvira x RBS-2 Gas Collection Line, in the municipality of Jaguaré / ES
Client: Petrobras UN-ES
RCA for hydrocarbon production in the wells located in Campo Marginal Crejoá, located in the municipality of Conceição da Barra / ES
Client: Koch Petróleo do Brasil
RCA of the Seismic Program in the Exploratory Blocks area ES-T-363, located in São Mateus / ES and ES-T-291 and ES-T-305, in Conceição da Barra / ES
Client: Koch Petróleo do Brasil
RCA of the 3D geophysical survey in Exploratory Blocks ES-T-392, Nativo district, São Mateus / ES
Client: VipetroRCA for installation and operation of the 138 kV Civit - Manguinhos Distribution Line, in the municipality of Serra / ES
Client: Escelsa - Energias do Brasil
RCA for 2D Geophysical Survey on ES-T-318, ES-T-362 and ES-T-380 Land Blocks in São Mateus / ES
Client: Brasalta Brasil Norte Trading of Petroleum Ltda
Environmental Control Report (RCA) on the 138 kV Santa Teresa Itarana Distribution Line, Santa Teresa / ES and Itarana / ES municipalities
Client: Escelsa - Energias do Brasil
Preparation of Risk Analysis Study at RCA for licensing of Volare Veiculos
Client: Marcopolo
Elaboration of Terms of Reference and RCA for licensing of Arcelor's Final Effluent Containment Dam Dredging
Client: ArcelorMittal Tubarão
Preparation of RCA Terms of Reference
Client: Environmental Brand
RCA drilling 3 wells in the Ipiranga River field
Client: Cheim